Microsoft Planner
Microsoft Planner is the work management app in Microsoft 365. Teams use it to create plans, organise tasks into buckets on a Kanban board, assign owners and due dates, and track progress with built-in charts. Since 2024 it is a single unified app that absorbed three previously separate products: the original Planner for team boards, Microsoft To Do for personal task lists, and Project for the web for lightweight project management. It runs inside Microsoft Teams, as a web app, and on mobile.
Part of the SharePoint reference · Licensing and limits verified against Microsoft documentation · Last reviewed 1 September 2026
Project Online reaches end of life on 30 September 2026. If your organisation still runs Project Online, that is the date to plan against. Project for the web and the Project and Roadmap apps in Teams began retiring in August 2025, with Planner and Planner Premium taking their place. What this means and what to check.
What the 2024 consolidation changed
Before 2024, Microsoft had three overlapping work management products with separate apps, separate data and separate admin surfaces. They are now one application called Microsoft Planner.
- Classic PlannerTeam Kanban boards, buckets, assignments — now Planner Basic
- Microsoft To DoPersonal task lists — now the My Tasks and My Day views
- Project for the webTimelines, dependencies, sprints — now Planner Premium
In April 2024 the Teams app previously called Tasks by Planner and To Do was renamed simply Planner. If your organisation’s documentation, training materials or intranet still refer to the old names, this is the rename people are hitting.
Basic versus Premium
The commercial line falls in a specific place, and it catches out teams who assume Planner does project management out of the box. It does not — the scheduling layer is the paid tier.
| Capability | Planner Basic | Planner Premium |
|---|---|---|
| Kanban boards and buckets | Included | Included |
| Assignees, due dates, labels, checklists | Included | Included |
| Grid, Board, Schedule and Charts views | Included | Included |
| Personal tasks (My Tasks, My Day) | Included | Included |
| Timeline (Gantt) view | No | Included |
| Task dependencies and critical path | No | Included |
| Sprints and backlogs | No | Included |
| Custom fields | No | Included |
| Goals and team workload | No | Included |
| Copilot in Planner | No | Included |
| Cost | Included in M365 | ≈ $10 / user / month |
Licence the schedulers, not the team. Premium is priced per user, but only the people who build and maintain the schedule genuinely need it. Contributors can work tasks in a premium plan on a Basic licence — they simply cannot view or edit the premium capabilities like Gantt or goals. Microsoft offers a 30-day trial from the diamond icon inside the app, which is the cheapest way to find out how many people actually need it.
Planner, Project, and what is retiring
This is where most of the confusion sits, because four things share the name Project and only some of them are going away.
- Project for the web — began retiring August 2025, along with the Project and Roadmap apps in Teams. Its capabilities live on as Planner Premium.
- Project Online — the older cloud service. End of life 30 September 2026. This is the one with a hard date.
- Microsoft Project desktop — a separate product, continuing unchanged.
- Project Server — also separate, also continuing, on its own lifecycle.
If you hold Project Plan 3 or Project Plan 5 licences, you already have Planner Premium — there is nothing extra to buy, and it is worth checking whether those licences are sitting unused while someone elsewhere evaluates Premium as a new purchase.
How Microsoft Planner fits into Microsoft 365
- Microsoft TeamsThe primary home. Planner sits in the left rail, and any plan can be pinned to a channel as a tab so the board lives beside the conversation.
- M365 GroupsEvery shared plan is owned by a group, so plan membership follows the team and inherits the same governance as a Team or SharePoint site.
- SharePointThe Planner web part displays a plan directly on a SharePoint page — the usual way a project site shows its current board.
- Microsoft LoopTask lists created in a Loop component can surface in Planner and To Do, so a checklist in a chat is not a dead end.
- Microsoft ListsThe nearest alternative and a common mix-up. Planner runs work to completion; Lists keeps records that persist after the work is done.
- Power AutomatePlan and task events can trigger flows, which is how approvals and cross-system routing get bolted onto a board.
Limits and thresholds
Planner’s limits are generous for team work and tight for anything resembling a portfolio. The one that surprises people is that Premium allows fewer tasks per plan than Basic, because it runs on a different engine.
| Hard limits — enforced by the service | |
| Tasks per plan — Basic | 9,000 |
|---|---|
| Tasks per plan — Premium | 3,000 |
| Buckets per plan — Basic | 200 |
| Backing object per shared plan | Microsoft 365 group |
| Standalone desktop app | None |
| Licensing and key dates | |
| Planner Basic included with | All commercial M365 plans |
| Planner Premium list price | ≈ $10 / user / month |
| Premium also included with | Project Plan 3, Project Plan 5 |
| Premium free trial | 30 days, in-app |
| Tasks by Planner and To Do renamed Planner | April 2024 |
| Project for the web retirement began | August 2025 |
| Project Online end of life | 30 September 2026 |
Sources: Microsoft Support, Frequently asked questions about Microsoft Planner; Microsoft Adoption, New Microsoft Planner; and Microsoft Learn guidance on Planner plan limits. The premium list price is Microsoft’s published standalone pricing and varies by agreement, region and term. Verified 1 September 2026. See the full SharePoint limits table for platform-wide figures.
Key takeaways
- 30 Sep 2026 Project Online reaches end of life on 30 September 2026 Project for the web began retiring in August 2025. Project desktop and Project Server are separate products and continue unchanged.
- 3 → 1 merged Planner absorbed three products, it was not retired Classic Planner, To Do and Project for the web became one app in 2024. “What is replacing Planner” has the question backwards.
- Gantt premium The scheduling layer is the paid tier Timeline view, dependencies, critical path, sprints and custom fields all need Premium. Teams routinely assume Planner does project management out of the box.
- 3,000 vs 9,000 Premium allows fewer tasks per plan than Basic Counterintuitive but documented — Premium runs on a different engine. Basic takes 9,000 tasks per plan; Premium takes 3,000.
- Plan 3/5 check first You may already own Premium Project Plan 3 and Plan 5 licences include Planner Premium. Organisations frequently evaluate it as a new purchase while paying for it elsewhere.
- 30 day trial Licence the schedulers, not the whole team Contributors can work tasks in a premium plan on a Basic licence. The in-app trial is the cheapest way to find out how few people actually need Premium.
Planner on a SharePoint project site
A plan that only exists in Teams is visible to the team in that Teams channel. For anyone outside it — a sponsor, a neighbouring department, someone who joins in month four — the work is effectively invisible. This is why most organisations pair a plan with a SharePoint project site.
The built-in Planner web part puts a board directly on a SharePoint page, and for a simple project site that is enough. Its limits are the familiar ones: it renders the board in its own fixed layout, shows one plan, and offers little control over how it sits alongside the milestones, documents, contacts and decisions that make up the rest of the page.
Making the project site worth visiting
ShortPoint is a no-code design layer for SharePoint. It does not replace Planner and changes nothing about how your plans work — it builds the site around them, so a sponsor can open one page and see where a project actually stands.
- Project sites combining the plan, milestones, documents, risks and team in one layout
- Live data pulled from the SharePoint lists you already maintain
- Portfolio and programme overviews across several projects at once
- Built and edited by PMs and coordinators, without a developer
Used on 350,000+ SharePoint sites by 12M+ people · Microsoft Solutions Partner · No credit card required
Common questions about Microsoft Planner
What is Microsoft Planner?
Microsoft Planner is the work management app in Microsoft 365. Teams use it to create plans, organise tasks into buckets on a Kanban board, assign owners and due dates, and track progress with built-in charts. Since 2024 it is a single unified app that absorbed three previously separate products: the original Planner for team boards, Microsoft To Do for personal task lists, and Project for the web for lightweight project management. It runs inside Microsoft Teams, as a web app, and on mobile.
What is Microsoft Planner used for?
Planner is used for organising team work into visual plans: tasks grouped into buckets on a Kanban board, assigned to people, with due dates, labels, checklists and attachments. Built-in charts show progress and workload at a glance. It suits projects and recurring team processes that have outgrown a shared to-do list but do not need full project management with dependencies and critical path. Common uses include campaign planning, onboarding programmes, content calendars, and sprint-style team workflows.
Is Microsoft Planner free?
Planner Basic is included in all commercial Microsoft 365 plans at no additional cost, which covers Kanban boards, buckets, task assignment, due dates, labels, checklists, personal task lists, and the Teams and Microsoft 365 integrations. There is no free standalone version outside a Microsoft 365 subscription. Planner Premium is a paid add-on listed at around $10 per user per month, and it is also included with Project Plan 3 and Project Plan 5 licences.
What is replacing Microsoft Planner?
Nothing is replacing Planner — Planner is the replacement. In 2024 Microsoft consolidated three products into it: the classic Planner, Microsoft To Do, and Project for the web. In April 2024 the Teams app previously called Tasks by Planner and To Do was renamed simply Planner. What was sold as Project for the web is now marketed as Planner Premium with essentially the same capabilities. The confusion runs the other way round: Planner absorbed other products rather than being retired itself.
What is the difference between Microsoft Project and Planner?
Planner Basic handles team task management — Kanban boards, buckets, assignees and due dates. Planner Premium, which is the rebranded Project for the web, adds the project management layer: Timeline or Gantt view, task dependencies, critical path, sprints, custom fields, team workload and goals. Microsoft Project desktop and Project Server remain separate products and continue unchanged. Project Online, the older cloud service, is a different matter — it reaches end of life on 30 September 2026.
Does Microsoft Planner have a Gantt chart?
Not in the version included with Microsoft 365. The Timeline view, which is Planner’s Gantt chart, is a premium feature and requires a Planner Premium, Project Plan 3 or Project Plan 5 licence. Task dependencies and critical path are premium for the same reason. Planner Basic offers Grid, Board, Schedule and Charts views, which cover progress and workload but not scheduled timelines. Microsoft offers a 30-day trial of the premium capabilities from inside the app.
What are buckets in Microsoft Planner?
Buckets are the columns on a Planner board, and they are how tasks get grouped within a plan. Most teams use them for workflow stages such as To Do, In Progress and Done, but they work equally well for workstreams, owners, phases, or any grouping that suits the plan. A basic plan supports up to 200 buckets. Tasks are dragged between buckets to show progress, and the board can be regrouped by assignee, due date, label or priority without changing the buckets themselves.
Does Microsoft Planner have a desktop app?
There is no standalone Windows or Mac desktop application for Planner. It runs inside Microsoft Teams, as a web app in the browser, and through iOS and Android mobile apps. Most people use it as the Planner app in the Teams left rail, which for practical purposes gives it a desktop presence. Microsoft Project desktop is a separate product and is not the same thing as Planner.